[Dec.-2016-New]Exam Pass 100%!Cisco 300-115 Exam PDF 230q Instant Download[21-30]

2016 Dec. New Cisco 300-115: Implementing Cisco IP Switched Networks (SWITCH v2.0) Exam Questions Updated Today!
Free Instant Download 300-115 Exam Dumps (PDF & VCE) 230q download from Braindump2go.com Today!

100% Real Exam Questions! 100% Exam Pass Guaranteed!

1.|2016 Dec. New 300-115 Exam Dumps (PDF & VCE) 230q download:
http://www.braindump2go.com/300-115.html
2.|2016 Dec. New 300-115 Exam Questions & Answers:
https://1drv.ms/f/s!AvI7wzKf6QBjgSVgicaB52AMWrK2

QUESTION 21
Pilot testing of the new switching infrastructure finds that when the root port is lost, STP immediately replaces the root port with an alternative root port. Which spanning-tree technology is used to accomplish backup root port selection?

A.    PVST+
B.    PortFast
C.    BackboneFast
D.    UplinkFast
E.    Loop Guard
F.    UDLD

Answer: D

QUESTION 22
A network engineer must adjust the STP interface attributes to influence root port selection. Which two elements are used to accomplish this? (Choose two.)

A.    port-priority
B.    cost
C.    forward-timers
D.    link type
E.    root guard

Answer: AB

QUESTION 23
A network engineer must set the load balance method on an existing port channel. Which action must be done to apply a new load balancing method?

A.    Configure the new load balancing method using port-channel load-balance.
B.    Adjust the switch SDM back to “default”.
C.    Ensure that IP CEF is enabled globally to support all load balancing methods.
D.    Upgrade the PFC to support the latest load balancing methods.

Answer: A

QUESTION 24
Refer to the exhibit. A network engineer investigates a recent network failure and notices that one of the interfaces on the switch is still down. What is causing the line protocol on this interface to be shown as down?
 

A.    There is a layer 1 physical issue.
B.    There is a speed mismatch on the interface.
C.    The interface is configured as the target of the SPAN session.
D.    The interface is configured as the source of the SPAN session.
E.    There is a duplex mismatch on the interface.

Answer: C

QUESTION 25
While doing network discovery using Cisco Discovery Protocol, it is found that rapid error tracking is not currently enabled. Which option must be enabled to allow for enhanced reporting mechanisms using Cisco Discovery Protocol?

A.    Cisco Discovery Protocol version 2
B.    Cisco IOS Embedded Event Manager
C.    logging buffered
D.    Cisco Discovery Protocol source interface
E.    Cisco Discovery Protocol logging options

Answer: A

QUESTION 26
After port security is deployed throughout an enterprise campus, the network team has been overwhelmed with port reset requests. They decide to configure the network to automate the process of re-enabling user ports. Which command accomplishes this task?

A.    switch(config)# errdisable recovery interval 180
B.    switch(config)# errdisable recovery cause psecure-violation
C.    switch(config)# switchport port-security protect
D.    switch(config)# switchport port-security aging type inactivity
E.    switch(config)# errdisable recovery cause security-violation

Answer: B

QUESTION 27
The network monitoring application alerts a network engineer of a client PC that is acting as a rogue DHCP server. Which two commands help trace this PC when the MAC address is known? (Choose two.)

A.    switch# show mac address-table
B.    switch# show port-security
C.    switch# show ip verify source
D.    switch# show ip arp inspection
E.    switch# show mac address-table address <mac address>

Answer: AE

QUESTION 28
A network engineer has just deployed a non-Cisco device in the network and wants to get information about it from a connected device. Cisco Discovery Protocol is not supported, so the open standard protocol must be configured. Which protocol does the network engineer configure on both devices to accomplish this?

A.    IRDP
B.    LLDP
C.    NDP
D.    LLTD

Answer: B

QUESTION 29
A manager tells the network engineer to permit only certain VLANs across a specific trunk interface. Which option can be configured to accomplish this?

A.    allowed VLAN list
B.    VTP pruning
C.    VACL
D.    L2P tunneling

Answer: A

QUESTION 30
For client server failover purposes, the application server team has indicated that they must not have the standard 30 second delay before their switchport enters a forwarding state. For their disaster recovery feature to operate successfully, they require the switchport to enter a forwarding state immediately. Which spanning-tree feature satisfies this requirement?

A.    Rapid Spanning-Tree
B.    Spanning-Tree Timers
C.    Spanning-Tree FastPort
D.    Spanning-Tree PortFast
E.    Spanning-Tree Fast Forward

Answer: D


!!!RECOMMEND!!!

1.|2016 Dec. New 300-115 Exam Dumps (PDF & VCE) 230q download:
http://www.braindump2go.com/300-115.html
2.|2016 Dec. New 300-115 Exam Questions & Answers:
https://youtu.be/dM4mTmskpfk

         

Categories 300-115 Dumps/300-115 Exam Questions/300-115 PDF/300-115 VCE/Cisco Exam

Post Author: mavis

Categories

Archives

Cisco Exam Dumps Download

200-301 PDF and VCE Dumps

200-901 PDF and VCE Dumps

350-901 PDF and VCE Dumps

300-910 PDF and VCE Dumps

300-915 PDF and VCE Dumps

300-920 PDF and VCE Dumps

350-401 PDF and VCE Dumps

300-410 PDF and VCE Dumps

300-415 PDF and VCE Dumps

300-420 PDF and VCE Dumps

300-425 PDF and VCE Dumps

300-430 PDF and VCE Dumps

300-435 PDF and VCE Dumps

350-401 PDF and VCE Dumps

350-401 PDF and VCE Dumps

350-801 PDF and VCE Dumps

300-810 PDF and VCE Dumps

300-815 PDF and VCE Dumps

300-820 PDF and VCE Dumps

300-835 PDF and VCE Dumps

350-801 PDF and VCE Dumps

200-201 PDF and VCE Dumps

350-601 PDF and VCE Dumps

300-610 PDF and VCE Dumps

300-615 PDF and VCE Dumps

300-620 PDF and VCE Dumps

300-625 PDF and VCE Dumps

300-635 PDF and VCE Dumps

600-660 PDF and VCE Dumps

350-601 PDF and VCE Dumps

352-001 PDF and VCE Dumps

350-701 PDF and VCE Dumps

300-710 PDF and VCE Dumps

300-715 PDF and VCE Dumps

300-720 PDF and VCE Dumps

300-725 PDF and VCE Dumps

300-730 PDF and VCE Dumps

300-735 PDF and VCE Dumps

350-701 PDF and VCE Dumps

350-501 PDF and VCE Dumps

300-510 PDF and VCE Dumps

300-515 PDF and VCE Dumps

300-535 PDF and VCE Dumps

350-501 PDF and VCE Dumps

010-151 PDF and VCE Dumps

100-490 PDF and VCE Dumps

810-440 PDF and VCE Dumps

820-445 PDF and VCE Dumps

840-450 PDF and VCE Dumps

820-605 PDF and VCE Dumps

700-805 PDF and VCE Dumps

700-070 PDF and VCE Dumps

600-455 PDF and VCE Dumps

600-460 PDF and VCE Dumps

500-173 PDF and VCE Dumps

500-174 PDF and VCE Dumps

200-401 PDF and VCE Dumps

644-906 PDF and VCE Dumps

600-211 PDF and VCE Dumps

600-212 PDF and VCE Dumps

600-210 PDF and VCE Dumps

600-212 PDF and VCE Dumps

700-680 PDF and VCE Dumps

500-275 PDF and VCE Dumps

500-285 PDF and VCE Dumps

600-455 PDF and VCE Dumps

600-460 PDF and VCE Dumps

Microsoft Exams Will Be Retired

AZ-103(retiring August 31, 2020)

AZ-203(retiring August 31, 2020)

AZ-300(retiring August 31, 2020)

AZ-301(retiring August 31, 2020)

77-419(retiring June 30, 2020)

70-333(retiring January 31, 2021)

70-334(retiring January 31, 2021)

70-339(retiring January 31, 2021)

70-345(retiring January 31, 2021)

70-357(retiring January 31, 2021)

70-410(retiring January 31, 2021)

70-411(retiring January 31, 2021)

70-412(retiring January 31, 2021)

70-413(retiring January 31, 2021)

70-414(retiring January 31, 2021)

70-417(retiring January 31, 2021)

70-461(retiring January 31, 2021)

70-462(retiring January 31, 2021)

70-463(retiring January 31, 2021)

70-464(retiring January 31, 2021)

70-465(retiring January 31, 2021)

70-466(retiring January 31, 2021)

70-467(retiring January 31, 2021)

70-480(retiring January 31, 2021)

70-483(retiring January 31, 2021)

70-486(retiring January 31, 2021)

70-487(retiring January 31, 2021)

70-537(retiring January 31, 2021)

70-705(retiring January 31, 2021)

70-740(retiring January 31, 2021)

70-741(retiring January 31, 2021)

70-742(retiring January 31, 2021)

70-743(retiring January 31, 2021)

70-744(retiring January 31, 2021)

70-745(retiring January 31, 2021)

70-761(retiring January 31, 2021)

70-762(retiring January 31, 2021)

70-764(retiring January 31, 2021)

70-765(retiring January 31, 2021)

70-767(retiring January 31, 2021)

70-768(retiring January 31, 2021)

70-777(retiring January 31, 2021)

70-778(retiring January 31, 2021)

70-779(retiring January 31, 2021)

MB2-716(retiring January 31, 2021)

MB6-894(retiring January 31, 2021)

MB6-897(retiring January 31, 2021)

MB6-898(retiring January 31, 2021)