QUESTION 1 A. Engineering time Answer: C QUESTION 2 A. Fixed primary data Answer: B QUESTION 3 A. 2 days Answer: C QUESTION 4 A. 30% - 50% Answer: A QUESTION 5 A. Copy on first write Answer: D QUESTION 6 QUESTION 7 QUESTION 8 QUESTION 9 A. 35%; Month 6 Answer: D QUESTION 10 A. Hot site Answer: A
Which element of a Time-State model represents an IT service failure?
B. Scheduled downtime
C. Standby time
D. Unscheduled downtime
What defines archival data?
B. Short-term data image
C. System recovery data
D. Volatile copy of data
Refer to the Exhibit. You are designing a new backup and recovery solution. You have determined that a disk-aware backup-to-disk solution will be used as the primary destination for backups. Once backups reach a specific retention period on disk, they will be moved to tape. To satisfy 90% of the e-mail restore requests from disk, what is the minimum required retention period?
B. 7 days
C. 14 days
D. 15 days
When designing the required number of replication links for array-based remote replication, what is the recommended utilization range per link?
B. 50% - 70%
C. 70% - 90%
D. 90% - 100%
Which technology is most commonly used with NAS point-in-time copies?
B. Copy on any access
C. Copy on first access
D. Copy on first read
Drag and Drop question.
What are the correct sequences of steps in a Data Classification (DC) process?
Answer:
Explanation:
http://www.emc.com/collateral/hardware/white-papers/h1017-data-classification-storage- optimization-wp.pdf (page 5 to 6)
Drag and Drop question.
What is the correct sequence of steps in a virtual machine array-to-array migration?
Answer:
Drag and Drop question.
In EMC SourceOne. What is the correct sequence of steps in which messages flow?
Answer:
A company wants to replace its physical tape library with a virtual tape library (VTL). To deploy the VTL, the company spends $300,000 for the hardware costs and $60,000 for the implementation charges. Once the data is migrated from the physical tape library to the VTL, the physical tape library will be decommissioned for a cost of $50,000. The company will gain $60,000 per month due to this VTL implementation. What is the return on investment (ROI) in one year and the break-even point for the company's initial investment?
B. 35%; Month 7
C. 76%; Month 6
D. 76%; Month 7
A company has a shared pre-staged infrastructure at an alternate site. This approach enables the company to rebuild systems and applications in the event of a disaster. What is the term for this strategy?
B. Manual failover site
C. Cold site
D. Warm site
Passing your EMC E20-017 Exam by using the latest E20-017 Exam Demo Full Version: http://www.braindump2go.com/e20-017.html
Post date: 2014-07-17 08:57:16
Post date GMT: 2014-07-17 08:57:16
Post modified date: 2014-07-17 08:57:16
Post modified date GMT: 2014-07-17 08:57:16
Powered by [ Universal Post Manager ] plugin. MS Word saving format developed by gVectors Team www.gVectors.com